October 2006, MEEG won a 30 million RMB project to construct a 33,000m3/day wastewater treatment plant. This project is another solid step taken to proveMEEG's expertise in the steel mill wastewater treatment field. Through this project, MEEG also established a firm relationship with Te Su Gang Steel. Co.

The wastewater treatment plant is currently in operation and has met the effluent design requirements. The innovative design of this project also dramatically reduced the water usage cost from 25~27 tons of water per ton of steel to 6 tons of water per ton of steel. As a part of this contract, MEEG was responsible to provide technical support in operating the wastewater treatment plant, and to provide maintenance to the entire wastewater treatment facility and auxiliary systems, including the electrical and instrumentation systems at the facility.

 
Influent, Effluent Requirements:

  Item Unit Influent Effluent 2nd(discharge)
1 pH   7.0 - 8.5 7.0 - 8.5 6 - 9
2 SS mg/L < 330 5 150
3 CODCr mg/L 150~200 60 100
4 BOD5 mg/L 30~40 25 30
5 oil mg/L 11 - 15 1 10
6 Hardness mg/L <400 <400  
7 NH3-N mg/L 1 1 15
8 Temperature ¡æ <38    
 
Copyright © 2008 McWONG ENVIRONMENTAL & ENERGY GROUP
Shanghai, China Suite 1001 Jintao Building 1900 Shang Cheng Road, Pudong Shanghai 200135 P. R. China
TEL: 021-68552275 FAX: 021-68552276 SERVICE: 021-68536670 Email: info@meeg.com.cn